How lengthy Does It take to Dig a 6 Foot Hole? production Rates for Manual and also Mechanical Excavation in Clay, Sand, Silt, Loam, Silty Sand, Silty Clay and Sandy Clay.

You are watching: How long does it take to dig a grave with a shovel

How lengthy it bring away to dig a hole relies on the manufacturing rate or excavation rate in this case, and the production rate for construction work depends on a selection of components which room going come be disputed below.

A 6 foot feet is approximately 1.83 metres deep in metric units. This is a really deep hole that would require earthwork support and method of access in and also out of the hole. To offer you one idea of just how deep this feet is, the average elevation of human being beings around the civilization ranges from 5 foot (152cm) come (6.10 foot (185.6cm). Exactly how long the takes to destruction a feet of this nature counts not just on that is height, but on its broad or diameter together well. An ext importantly, you have to consider other factors such together the soil conditions. The prices for digging in different types of soils space not the same. It’s much easier, quicker and also cheaper to destruction in light soil such together silty sand, loess or loam. Digging in medium soil such as sandy clay will certainly slightly minimize the production output rate and also increase the labour cost. Digging in heavy soils such as clay, shale and caliche will alleviate the production output price further, and increase costs. Heavy soils room the most expensive soil type to dig in if we room not acquisition rock into consideration, otherwise floor with loose and difficult rock is the most expensive.

Heavy soils room cohesive soils through a high quantity of fine corpuscle (clay). They tend to be difficult when dry and plastic once moist. Irradiate soils room granular soils prefer sand and silt through a tiny amount or absence of clay. Together a result, they lack cohesive strength, which makes them less complicated to destruction in 보다 cohesive soils.


The degree of surface and also subsurface soil compaction has actually a bearing on just how easy and also how lengthy it would require to dig any type of hole or trench. Very trafficked ground i m sorry is offered a lot by engine vehicles, livestock and human beings will have actually its subsurface layer compacted come a higher degree than less trafficked ground. Also granular soil like sand and also gravel can get compacted come a high level making it daunting to excavate.


How long it bring away to destruction a hole likewise depends ~ above the type of digging tools used. Obviously, a labourer using a power digging tool favor a tractor-mounted auger will make development much much more quickly 보다 a labourer utilizing a pick, shovel and also clamshovel to dig a 6 foot hole.


*
*

Chart – production Rates for Digging Holes and Trenches in Light, Medium and also Heavy Soil


Calculations – how Long that Takes To dig a 6 Foot hole < hand-operated Excavation making use of a Pick and also Shovel >

Shown below are calculations for excavation production outputs for digging a 6 foot deep timeless grave and stormwater drywell making use of hand tools (pick, shovel, clamshovel etc.) in different species of soils.

1 – exactly how Long go It require to Dig a 6 Foot grave using hands-on Labour and Hand Tools?

Calculations:

Assuming the standard dimension of a dig is 30 inches broad x 7.2 feet long x 6 feet deep, you will require to excavate 2.5 x 7.2 x 6 ft = 108 cf that soil.

Digging in irradiate Soil:

Volume the excavated soil: V = 2.5 x 7.2 x 6 ft = 108 cf.

Manual excavation conventional output rate for excavating in light soil for trenches 4 to 6 feet deep: 0.68 cy every hour.

Converting CF to CY: 108 cf = 4 cy.

0.68 cy = 1 hour,

4 cy = More,

Therefore, (4 x 1)/0.68 = 5.8 hours. It takes 5.8 hours to dig 4 cubic yards of planet in light floor (sand, silt, loess, etc.)

Digging in medium Soil:

Manual excavation traditional output price for excavating in medium soil because that trenches 4 come 6 feet deep: 0.54 cy every hour.

0.54 cy = 1 hour,

4 cy = More,

Therefore, (4 x 1)/0.54 = 7.41 hours. That takes 7.41 hours to destruction 4 cubic yards of earth in medium soil (sandy clay, loam, silty clay, silty clay loam and sandy clay loam etc).

Digging in hefty Soil:

Manual excavation typical output price for excavating in heavy soil for trenches 4 come 6 feet deep: 0.46 cy per hour.

0.46 cy = 1 hour,

4 cy = More,

Therefore, (4 x 1)/0.46 = 8.70 hours. That takes 8.70 hours to dig 4 cubic yards of planet in hefty soil (clay, shale, caliche, etc).


2 – just how Long go It require to Dig a 6 Foot Deep Hole because that Stormwater Drywell using hands-on Labour and also Hand Tools?

Calculations:

Drywell hole Size: 450 x 450 x 1830mm Deep <1.5 x 1.5 x 6 Foot Deep>

We space going to estimate just how long it takes to dig a square hole the is 1.5 ft vast x 6 ft deep.


Excavation in irradiate Soil:

Volume of excavated soil, V = 1.5 x 1.5 x 6ft = 13.50 cf

Manual excavation standard output rate for excavating in light floor for trenches 4 come 6 feet deep: 0.68 cy every hour.

Converting CF to CY: 13.50 cf = 0.50 cy

0.68 cy = 1 hour

0.50 cy = Less

Therefore, (0.50 x 1)/0.68 = 0.74 hours. It takes 0.61 hours (44 minutes) to dig 0.50 cubic yards of planet in light soil (sand, silt, loess, etc).

Excavation in medium Soil:

Volume of excavated soil, V = 1.5 x 1.5 x 6ft = 13.50 cf

Manual excavation typical output rate for excavating in tool soil for trenches 4 come 6 feet deep: 0.54 cy every hour.

Converting CF to CY: 13.50 cf = 0.50 cy

0.54 cy = 1 hour

0.50 cy = Less

Therefore, (0.50 x 1)/0.54 = 0.93 hours. That takes 0.93 hours (56 minutes) to dig 0.50 cubic yards of planet in tool soil (sandy clay, loam, silty clay, silty clay loam and also sandy clay loam etc).

Excavation in hefty Soil:

Volume that excavated soil, V = 1.5 x 1.5 x 6ft = 13.50 cf

Manual excavation standard output rate for excavating in light soil for trenches 4 come 6 feet deep: 0.46 cy every hour.

Converting CF come CY: 13.50 cf = 0.50 cy

0.46 cy = 1 hour

0.50 cy = Less

Therefore, (0.50 x 1)/0.46 = 1.09 hours. The takes 1.09 hours to destruction 0.50 cubic yards of planet in hefty soil (clay, shale, caliche, etc).

 

Calculations – just how Long that Takes To dig a 6 Foot hole < mechanical Excavation Using heavy Machinery or Power tools >

Shown listed below are calculations for excavation manufacturing outputs for digging a 6 foot deep timeless grave and stormwater drywell making use of mechanized tools in different types of soils.

1 – exactly how Long does It take to Dig a 6 Foot Deep Grave making use of Mechanized Equipment?

Calculations:

We space going to use a backhoe through operator, one labourer and ¾ CY bucket. Assuming the standard size of a dig is 30 inches large x 7.2 feet lengthy x 6 feet deep, girlfriend will require to excavate 2.5 x 7.2 x 6 ft = 108 cf of soil.

Digging in irradiate Soil:

Volume the excavated soil: V = 2.5 x 7.2 x 6 ft = 108 cf.

Mechanical excavation (Backhoe with operator, one labourer and also ¾ CY bucket) typical output rate for excavating in light floor for trenches 4 come 6 feet deep: 13.2 cy per hour.

Converting CF to CY: 108 cf = 4 cy.


13.2 cy = 1 hour,

4 cy = More,

Therefore, (4 x 1)/13.2 = 0.30 hours. The takes 0.30 hours (18 minutes) to dig 4 cubic yards of earth in light soil (sand, silt, loess, etc.)

Digging in Sand:

Volume that excavated soil: V = 2.5 x 7.2 x 6 ft = 108 cf.

Mechanical excavation (Backhoe v operator, one labourer and ¾ CY bucket) typical output price for excavating in light soil for trenches 4 to 6 feet deep: 16 cy every hour.

Converting CF to CY: 108 cf = 4 cy.

16 cy = 1 hour,

4 cy = More,

Therefore, (4 x 1)/16 = 0.30 hours. The takes 0.25 hours (15 minutes) to dig 4 cubic yards of planet in sand.

Digging in tool Soil:

Mechanical excavation (Backhoe v operator, one labourer and also ¾ CY bucket) conventional output rate for excavating in medium soil for trenches 4 come 6 feet deep: 12.5 cy every hour.

12.5 cy = 1 hour,

4 cy = More,

Therefore, (4 x 1)/12.50 = 0.32 hours. It takes 0.32 hours (19.2 minutes) to destruction 4 cubic yards of earth in medium soil (sandy clay, loam, silty clay, silty clay loam and also sandy clay loam etc).

Digging in hefty Soil:

Mechanical excavation (Backhoe with operator, one labourer and ¾ CY bucket) conventional output rate for excavating in hefty soil because that trenches 4 come 6 feet deep: 10.3 cy every hour.

10.3 cy = 1 hour,

4 cy = More,

Therefore, (4 x 1)/10.3 = 0.39 hours. It takes 0.39 hours (23.3 minutes) to destruction 4 cubic yards of planet in hefty soil (clay, shale, caliche, etc).

1 – just how Long go It take to Dig a 6 Foot Deep Stormwater Drywell utilizing Mechanized Equipment?

We space going come estimate just how long the takes to destruction a 16 customs diameter x 6 ft deep hole utilizing a truck-mounted A-frame hoist and power activate auger.

Drywell hole size: 1.33 ft diameter x 6 foot deep.

Volume the cylinder: V = πr²h

V = π (1.33)² x 6

V = 33.34 cf

Excavation in steady Soil:

Volume the excavated soil, V = 33.34 cf

Converting CF to CY: 33.34 cf = 1.23 cy.

Mechanical excavation (Truck-mounted A-frame hoist and also power activate auger) standard output price for digging in stable soil for holes: 680 VLF per day (VLF represents Vertical straight Foot in Construction).

See more: How Much Gas Does A Honda Accord Hold, What Is The Mpg Of The 2020 Honda Accord

680 vlf = 1 work (8-hour day)

6 vlf = Less

Therefore, (6 x 8)/680 = 0.07 hours. That takes 0.07 hours (4.24 minutes) to dig 1.23 cubic yards of planet in stable soil. This way it takes 4.24 minute to dig a 6 foot deep feet of 16 inch diameter.